顶管通道近接施工对有轨电车的影响及优化分析 被引量:1

Influence of Pipe Jacking on the Adjacent Tram Lines
原文传递
导出
摘要 针对顶管通道近接苏州有轨电车1号线施工工程,采用修正莫尔-库伦模型,模拟顶管井基坑的开挖和顶管推进的实际施工步骤,并根据计算结果提出了针对性工程优化措施。通过对顶管井基坑开挖和顶管掘进过程的动态模拟,分析得到整个施工阶段中临近有轨电车道床最大沉降量和水平位移小于苏州市有轨电车暂行保护标准的要求。有限元计算为顶管施工方案可行性提供理论依据,可为类似项目提供参考。 The construction of a pipe jacking project that adjacent to the existing Tram Line No.1 in Suzhou under operation was numerically simulated.The launching jacking pit excavation and the pipe jacking process were simulated by using the modified Mohr-Coulomb constitutive model.The construction sequence was therefore optimized from the numerical analysis results.From the numerical analysis results of the pipe jacking,it is concluded that both the maximum vertical and lateral movement at the existing tram line met the code allowable values.
作者 曹一龙 CAO Yilong(Guangzhou Metro Design Research Institute Co.,Ltd.,Guangzhou 510000)
出处 《土工基础》 2019年第3期261-263,275,共4页 Soil Engineering and Foundation
基金 广州地铁设计研究院股份有限公司科研项目(YK-2017-72)
关键词 顶管 有轨电车 修正莫尔-库伦模型 Pipe Jacking Tram Lines Modified Mohr-Coulomb Model
  • 相关文献

参考文献3

二级参考文献14

  • 1石晓冬.北京城市地下空间开发利用的策略研究[J].现代城市研究,2005,20(6):23-25. 被引量:13
  • 2李丽,王珊,戴俭.北京旧城中心区地下空间开发策略思考[J].地下空间与工程学报,2005,1(5):665-669. 被引量:7
  • 3石晓冬.北京城市地下空间开发利用的历程与未来[J].地下空间与工程学报,2006,2(B07):1088-1092. 被引量:41
  • 4朱合华(主编).地下建筑结构[M].北京:中国建筑工业出版社,2007.
  • 5机械工业第三勘察设计研究院.王家墩东站岩土工程勘察报告[R].2008.
  • 6中铁隧道勘测设计院有限公司.王家墩东站Ⅳ号出人口施工图设计[R].2009.
  • 7上海隧道股份浦东有限公司.王家墩站矩形顶管工程施工组织计划[R].2011.
  • 8上海隧道股份浦东有限公司.矩形顶管机工程应用介绍[R].2010.
  • 9中国工程建设协会标准.CECS246-2008给水排水工程顶管技术规程[S].北京:中国计划出版社,2008.
  • 10中华人民共和因行业标准.CJJ105-2005城镇供热管网结构设计规范[S].北京:中国建筑工业出版社,2005.

共引文献31

同被引文献11

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部