某地铁车站基坑回筑阶段不同换撑设置情况的对比分析 被引量:1

Retractable Strut Installations During the Backfill of Subway Station Excavations
原文传递
导出
摘要 对苏州轨道交通5号线星塘街车站基坑支撑的竖向设置进行分析,通过计算比较了几种不同支撑+换撑组合方案,结果表明:不同的支撑+换撑方案,支护结构最大变形和最大弯矩出现的工况不同,对特定的地铁车站,只要支护结构最大变形在规定值以内,应尽量减少甚至避免回筑阶段的临时换撑,虽然临时换撑的减少或取消会使支护墙体弯矩增加而导致含钢量增加,但整体造价更省,且在施工便利性和工期方面更具优势,研究可为类似工程提供参考。 During the backfilling of the underground structures for a subway station,if a cross strut needs to be removed,an extractable strut is usually installed below this cross strut.Conventionally,the extractable strut is not optimized for the deformation control.This paper presents a case history of the application of the extractable strut in the supporting of Xingtang Street Station structures for Suzhou Transit Line No.5.The locations of the vertical struts were evaluated.Several different struts plus extractable struts were compared.It is concluded that different strut arrangement resulted in different maximum bending moment and at different locations.For the backfilling of the subway station,the number of extractable struts should be minimized and even avoid as long as the maximum bending moment is within the tolerable limits.Although the reduction of the extractable will result in the increase of the bending moments in the supporting structures and increase the content of steel,the over construction cost is still cost effective.
作者 黄振波 HUANG Zhenbo(Guangzhou Metro Design Research Institute Co.,Ltd.,Guangzhou 510000)
出处 《土工基础》 2019年第3期272-275,共4页 Soil Engineering and Foundation
关键词 地铁车站基坑 支撑 换撑 分析比较 Subway Station Excavation Bracing Support Bracing Replacement Comparison and Analysis
  • 相关文献

参考文献4

二级参考文献30

共引文献74

同被引文献7

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部