摘要
黄河某滩区迁建安置区,工程规模较大,地基主要受力层为软弱液化土层。根据拟建物结构、荷载、抗震要求,结合工程建设环境,选择合理的地基处理方案,既可保证处理效果,又可方便施工,缩短工期,大幅度降低工程造价。工程建设单位应重视并提前进行地质勘察工作,选择合理的地基处理方案,以免因工期等人为因素,使地基处理方案选择受限。地基处理施工单位,应遵循施工技术规程,严格按照地基处理方案进行施工,遇到特殊情况,及时与勘察、设计单位沟通。
A large relocation residential building development project in Yellow River fluvial area is on the soft subsurface soils.Under the design earthquake intensity,the subsurface soils are also susceptible to be liquefiable.This paper presents the selection of the soil improvement program that could meet the structural,loading and seismic requirements and is also cost effective,simple construction and meets the construction schedule.The owner and the design consultant should pay attention on the subsurface conditions and carefully select the ground improvement method(s).The contractor should follow the design criteria and the code requirements in the implementation of the ground improvement method(s).When an unexpected condition is encountered during the construction,the effective communications among the geotechnical investigation consultant,building design consultant and the owner are critically important.
作者
宁小侃
冯强
李东东
NING Xiaokan;FENG Qiang;LI Dongdong(Xinxiang Chuangxin Geotechnical Engineering Co.,Ltd.,Xinxiang 453000;Division of Geotechnical Investigation,Henan Provincial Hydrologiical Co.Ltd,Zhengzhou 4530003)
出处
《土工基础》
2019年第4期411-413,共3页
Soil Engineering and Foundation
关键词
软弱土
液化土
抗震
水泥土搅拌桩
钻孔灌注桩
soft soils
seismic liquefiable soils
earthquake resistance
soil cement mixed columns
drilled and cast-in-place reinforced concrete piles