钢管混凝土拱桥施工仿真计算可视化 被引量:2

Visual Implement of Construction Simulation Computation for Concrete-Filled Steel Tubular Arch Bridges
下载PDF
导出
摘要 针对钢管混凝土拱桥拱肋吊装施工特点和控制要求,提出了按照迭代前进算法对拱肋拼装过程进行仿真计算的可视化实现模式。并且介绍了利用可视化技术进行仿真计算能够形象地再现现场,快捷地实现对拱肋吊装施工进行吊装预测、现场实时监控,为施工控制提供了有效的手段。 With reference to the characteristics and control requirements for erection of arch ribs of the concretefilled steel tubular arch bridges, this paper presents a visual implement mode of simulation computation of arch rib assembling process according to iterative goahead method, and illustrates that the simulation computation using the visual implement techniques can vividly reproduce the situations at construction site, rapidly realize predicting of arch rib erection and realtime monitoring, and thus provides construction control with effective means.
出处 《桥梁建设》 EI CSCD 北大核心 2003年第5期15-18,共4页 Bridge Construction
基金 湖北省交通科技资助项目(鄂交科教[2001]495号文)
关键词 拱桥 拱肋 拼装 仿真计算 arch bridge arch rib assembling simulation computation
  • 相关文献

参考文献3

二级参考文献9

共引文献48

同被引文献3

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部