期刊文献+

地铁隧道暗挖施工对地表密集建筑物的影响研究 被引量:11

Infl uence on concentrated buildings induced by undercutting construction of subway tunnel
下载PDF
导出
摘要 在城市地铁修建过程中,地铁下穿已有管线、地面建筑物往往是整个线路修建过程中的难点及风险控制点。本文基于深圳市地铁5号线某暗挖隧道区间,针对暗挖隧道施工对地表密集民房的影响开展研究。隧道开挖采用上下短台阶加临时仰拱和中立柱施工法。采用有限元分析方法对两种不同工况进行数值仿真计算,研究最优开挖策略。研究表明:相对于未处理工况,采用旋喷桩隔离墙对隧道附近土层进行处理,以及对隧道正上方房屋进行拆除后,地表沉降减小幅值达49%,隧道拱顶沉降减小幅值达35%,临近建筑的沉降及差异沉降减小幅值达67%,同时可以有效减少施工开挖对地面沉降的影响。 During the urban subway construction, the stages when the tunnel pass under existing pipelines and buildings are always the technology and risk control points. Base on the underground excavated tunnel section of Shen-Zhen subway line5, study was conducted on the influence of concentrated buildings above the excavated tunnels. Tunnel excavation method adopted the up-down-short-terrace method, with temporary Invert and B-pillar. Two calculation conditions are computed by finite element analytical method to determine the optimal excavation strategy. compared to the original condition, the updated calculation condition took Jet grouting pile isolation wall to strengthen soil close to the tunnel structure and dismantled the buildings above the tunnel. The results showed that by the updated calculation condition, the amplitude of ground settlement decrease 49% than the original condition, while the amplitude of settlement on tunnel vault decrease 35%, and amplitude of settlement and differential settlement of adjacent building decrease 67%. Therefore, the treat measure were proved effectively on reduceing the influence of ground settlement by excavate construction.
出处 《土木工程学报》 EI CSCD 北大核心 2015年第S1期311-315,共5页 China Civil Engineering Journal
基金 北京市地铁运营有限公司博垢项目基金--洞体隧道地铁衬砌结构补强技术研究资助(2013000510000017) 北京市地铁运营有限公司科研项目--基于初始损伤的盾构隧道病害演化机理及维修养护标准研究资助(2015000510000008)
关键词 地铁 建筑物 地表沉降 差异沉降 subway building ground settlement differential settlement
  • 相关文献

参考文献3

  • 1GB 50003-2011.砌体结构设计规范[S],2011.
  • 2PAULSON B C,,MSCE M.Underground Transit Station Constructionin Japan. Journal of the Construction Division,American Society of Civil Engi-neering . 1982
  • 3ONO J,,MURATA K.Construction of a Very Deep Subway Station Using Cut-and Cover Method under HighGroundwater Pressure. International Journal of Rock Mechanics and Mining Sciences and Geomechanics Ab-stracts . 1995

共引文献19

同被引文献65

引证文献11

二级引证文献37

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部