摘要
对刘家峡电厂增容改造前后HL001和HLA430a两种型号水轮机的运行、磨蚀及效率变化情况进行了对比分析,简述了提高水轮机综合性能的几项关键措施,对多泥沙河流电站机组运行和老厂的增容改造工作有一定的借鉴意义。
Analysis is made for the operation, abrasion and efficiency variation of HL001 and HLA430a type hydro turbine before and after capacity upgrading in Liujiaxia Hydro Power Station. Some measures to improve hydro turbine performance are described. It can be used as reference for sediment - laden river power station operation and capacity upgrading in aged hydro power station.
出处
《西北电力技术》
2003年第5期22-25,共4页
Northwest China Electric Power