既有隧道上方修建轻轨车站的设计与施工对策

Design and construction measures for a light-rail station to be built above an existing tunnel
下载PDF
导出
摘要 某轻轨车站拟修建于正在营运中的既有隧道上方 ,该隧道为双洞双向四车道的城市道路隧道 ,修建轻轨车站时需掘除隧道上方的部分岩层。文中通过力学计算分析 ,确定了方案的可行性 ,并对轻轨车站实施过程中有关既有隧道的保护以及轻轨车站的设计和施工提出了切实可行的措施。 A light-rail station is planned to be built above an existing tunnel, which is a twin-tube, two-direction and four traffic lane road one. Part of the rocks above the tunnel will be removed before constructing the light-rail station. According to the mechanical calculation and analysis, the feasibility of this project is confirmed. In addition, some feasible measures are put forward to protect the existing tunnel and to design and build the light-rail station.
作者 罗衍俭 缪仑
出处 《现代隧道技术》 EI 2003年第5期7-10,共4页 Modern Tunnelling Technology
关键词 道路隧道 轻轨车站 隧道保护 光面爆破 喷锚支护 Road tunnel Tunnel protection Smooth blasting Sprayed concrete and bolting Light-rail station
  • 相关文献

参考文献2

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部