摘要
文章介绍了水平旋喷桩超前预加固技术在深圳地铁大剧院~科学馆区间流塑状粘性土中的应用 ,重点阐述了水平旋喷桩加固机理、技术特点 ,提出了水平旋喷桩的设计依据和设计参数 ,对水平旋喷桩的施工工艺、机械配套、施工关键技术、加固效果、安全性、经济性等进行了详述 。
This paper introduces the technique of the advance reinforcement of soil with horizontal rotary jet grouting piles in plastic clay in a running tunnel from the Grand Theater to Scientific Gym in Shenzhen metro. The mechanism of reinforcement and technical features are emphasized and the design basis and parameters of the horizontal jet grouting piles are presented. The construction technology, equipment, key points of construction, results of reinforcement, safety reliability and economy, and so on, are also described in detail, which can be referred to by the similar projects.
出处
《现代隧道技术》
EI
2003年第5期26-29,共4页
Modern Tunnelling Technology
关键词
地铁隧道
软弱围岩
水平旋喷桩
预加固
Metro tunnel
Weak rocks
Horizontal rotary jet grouting pile
Advance reinforcement