针对110 kV来集变电站构架倾斜的问题进行分析,采取对构架优化改造和对地基进行灌浆处理,从根本上解决了该变电站构架倾斜的问题,提高了矿井变电站供电的安全可靠性。
A frame of 1 10 kV Laiji substation tilts.After analyzing the problem,measures from two aspects are con-ducted.One is to optimize and transform the frame.The other is to conduct grouting treatment to the foundation.These measures fundamentally solve the problem of substation frame tilt and improve security and reliability of mine substation.
出处
《通信电源技术》
2015年第3期110-111 116,116,共3页
Telecom Power Technology
关键词
变电站
构架
安全运行
substation
frame
safe operation