摘要
文章关注对内恢复厂用电的黑启动过程,介绍了厂用电黑启动的概念。通过分析水电站厂用电黑启动涉及的六大系统及应注意的问题,给出了厂用电黑启动的基本流程,为普遍性的水电站厂用电黑启动方案编制做出铺垫。
This paper focuses on the black-start process of internal recovery for auxiliary power,introduces the concept of black-start for auxiliary power.By analyzing the six systems involved in black-start of auxiliary power for hydropower station and problems needed to be noted,the basic procedure of black-start for auxiliary power is given,which makes base for the black-start programming of auxiliary power for universal hydropower station.
出处
《通信电源技术》
2016年第3期73-74,共2页
Telecom Power Technology