摘要
蒲石河抽水蓄能电站#1机组定子由哈尔滨电机厂供货,该厂吸收和借鉴阿尔斯通技术,首次实现抽水蓄能电机国产化。施工过程中与阿尔斯通定子组装和下线工艺进行对比,有其独特的施工工艺。文章针对#1机组定子绕组安装、铁损试验、定子下线和定子试验等环节进行重点阐述,总结定子绕组安装工艺以供参考。
The stator of# 1 unit in the Pushihe pumped storage power plant is supplied by Harbin Electric Supply.The localization of pumped storage machine is realized for the first time by adopting Alstom technology.Construction process has its unique technology compared with stator assembly and winding installation of Alstom.In this paper,stator winding installation,iron loss test,stator test are demonstrated and the stator winding installation process is summarized for reference.
出处
《通信电源技术》
2016年第3期170-171,共2页
Telecom Power Technology
关键词
定子焊接
定位筋安装
铁损试验
定子下线
线棒试验
stator welding
positioning bar installation
iron loss test
winding installation
bar test