摘要
随着数据中心建设的集中化、大型化发展,10 kV油机并机系统的应用越来越多。文章主要探讨10 kV油机并机系统的控制管理方案以及与市电的切换方案,以达到最优的技术方案选用。在提高供电可靠性前提下,优选方案能够减少建设成本和运维成本,提高运维效率。
With the centralization and large-scale development of data center construction,the application of 10 kV diesel generator parallel operation system is more and more.This article mainly discussed the control and management scheme of 10 kV diesel generator paralleled system and the switching scheme of the electric power,in order to achieve the best technical scheme selection.Under the premise of improving the reliability of power supply,the optimization scheme can reduce the construction cost and operation cost,and improve the efficiency of operation and maintenance.
出处
《通信电源技术》
2016年第5期137-139,共3页
Telecom Power Technology
关键词
10
kV油机
并机控制
负载管理
切换管理
10 kV diesel generator
paralleled control
load management
switch management