期刊文献+

小型水电站技术改造要点及施工管理 被引量:6

Technical Transformation Points and Construction Management of Small Hydropower Stations
下载PDF
导出
摘要 国家总体蓬勃发展背后离不开电力能源。现阶段,电力能源主要有五种发电方式,即火力发电、核能发电、太阳能发电、水力发电和风力发电。水力发电在运营成本、可持续发展、造成的污染等方面均占据一定优势,但目前我国水力发电领域仍存在一定问题。基于此,以湖南省为例,深入分析、阐述小型水力发电站存在的问题,并提出应对措施。 Power energy is indispensable to the overall vigorous development of the country. At present,there are five main power generation modes,namely thermal power generation,nuclear power generation,solar power generation,hydroelectric power generation and wind power generation. Hydropower has some advantages in operation cost,sustainable development and pollution,but there are still some problems in the field of hydroelectric power in China. Based on this,taking Hunan Province as an example,this paper deeply analyses and expounds the existing problems of small hydroelectric power generation,and puts forward the corresponding measures.
作者 李滨鹰 LI Bin-ying(Maoeerkou Hydropower Station,Fenghuang 416200,China)
机构地区 猫儿口水电站
出处 《通信电源技术》 2019年第2期237-238,共2页 Telecom Power Technology
关键词 小型水电站 技术改造 施工管理 应对措施 small hydropower station technical transformation construction management countermeasure
  • 相关文献

参考文献3

二级参考文献12

共引文献12

同被引文献24

引证文献6

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部