期刊文献+

5G CRAN机房机柜热管理研究 被引量:1

Research on Thermal Management of 5G CRAN Computer Room Cabinet
下载PDF
导出
摘要 随着5G从2019年6月6日起正式商用,5G基站大规模建设随之而来。运营商探索采用CRAN模式开展5G基站建设,将2G/4G/5G BBU集中布放。CRAN基站建设的好处是能够节省机房的租赁费和电费,未来也易开展BBU协同,但是也面临诸多问题。除了建设方面的难题外,5G BBU功耗较高。集成4~8个BBU,如何解决设备散热问题值得探索。因此,将通过案例研究BBU集中布放后的散热管理,解决设备安全运行问题,同时借鉴微模块技术降低基站的电费,实现企业的长远发展。 With the official commercialization of 5 G from June 6,2019,large-scale construction of 5 G base stations has followed.Operators explored the use of CRAN mode to build 5 G base stations and centralize 2 G/4 G/5 G BBUs.The advantage of CRAN base station construction is that it can save the rental fee and electricity cost of the equipment room.It is easy to carry out BBU coordination in the future,but it also faces many problems.In addition to the construction challenges,the 5 G BBU consumes more power.Integrating 4 to 8 BBUs,how to solve the problem of device heat dissipation is worth exploring.Therefore,through the case study,the thermal management of the BBU will be deployed in a centralized manner to solve the problem of safe operation of the equipment.At the same time,the micro-module technology will be used to reduce the electricity cost of the base station and realize the long-term development of the enterprise.
作者 纪辰 刘鑫 李方林 JI Chen;LIU Xin;LI Fang-lin(China Mobile Guangdong Shenzhen Branch,Shenzhen 518000,China;Huawei Technologies Co.,LTD.,Shenzhen 518000,China)
出处 《通信电源技术》 2019年第S1期173-175,共3页 Telecom Power Technology
关键词 5G CRAN 机柜散热 CFD仿真 5G CRAN cabinet cooling CFD simulation
  • 相关文献

同被引文献3

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部