期刊文献+

防撞梁受冲击载荷的试验研究 被引量:4

Experimental research on rubbing beam under impact load
下载PDF
导出
摘要 为了解决防撞梁受冲击载荷时强度计算问题,首次在自制的提升机模拟试验台上研究了提升容器对防撞梁的冲击过程,得到了不同工况条件下的防撞梁瞬态冲击力变化曲线.对不同工况下的曲线进行线性回归,得到对应的拟合方程.结果表明:防撞梁的瞬态冲击载荷不仅与冲击距离呈线性关系,而且和提升容器下降侧与上升侧的张力差、提升钢丝绳的弹性系数有关.因此,为了保证提升系统安全可靠的运行,必须有效地降低过卷时的冲击速度. In order to calculate the strength of rubbing beam under impact load, the process of rubbing beam being impacted was studied on the self-made hoist imitating test stand to establish instantaneous impact force curves for the rubbing beam, and linear regression fitting equations made these basic experimental data ready for design of rubbing beam. The instantaneous impact force is linear with impact distance, and depends on the difference in tension between descending and ascending vessels and the elastic coefficients of hoisting ropes. In order to ensure the safety and reliability of hoisting system, reduce the impact force of rubbing beam and decrease the damage due to overwinding, the impact speed must be reduced when overfalling occurs.
出处 《哈尔滨工业大学学报》 EI CAS CSCD 北大核心 2003年第10期1202-1204,共3页 Journal of Harbin Institute of Technology
基金 煤炭科学基金资助项目(97-305) 江苏省普通高校高新技术产业发展项目(JH02-094).
关键词 防撞梁 冲击载荷 强度 矿井 提升系统 冲击距离 线性回归 冲击速度 Crashworthiness Impact testing Loads (forces) Regression analysis Strength of materials
  • 相关文献

参考文献7

二级参考文献13

  • 1张家康,黄文萃.井塔楼层结构设计问题[J].特种结构,1994,11(2):28-33. 被引量:4
  • 2郭德民.摩擦提升过卷的类型及安全设施的完善[J].煤矿设计,1996(3):17-19. 被引量:3
  • 3白世昌.介绍一种日本的托罐装置[J].煤矿设计,1996(3):27-27. 被引量:1
  • 4团体著者,钢结构设计规范GBJ17-88,1989年,6页
  • 5郭在田,薄壁杆件的弯曲与扭转,1989年,192页
  • 6阮慎兴,煤矿设计,1981年,2期,30页
  • 7倪成生(译),塔式井架的设计与计算,1979年,21页
  • 8魏明钟.钢结构设计新规范应用讲评[M]中国建筑工业出版社,1991.
  • 9郭在田.薄壁杆件的弯曲与扭转[M]中国建筑工业出版社,1989.
  • 10(苏)安东若夫(Г.П.Антонов)著,倪成生.塔式井架的设计与计算[M]煤炭工业出版社,1979.

共引文献12

同被引文献28

引证文献4

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部