摘要
介绍了大同至五台山段县际公路改造中勘测设计和合理施工的方法 ,充分利用了旧油路 ,现有桥梁 ,涵洞 ,构造物 ,达到了提高标准 。
Combined with the reconstruction work of the existing regional road between Datong and Wutai in this paper concrete survey, design and construction methods are introduced based upon fully utilizing of existing pavement, bridge and culvert to save invest cost.
出处
《山西建筑》
2003年第13期108-109,共2页
Shanxi Architecture
关键词
旧路改造
设计
工程施工
涵洞
构造物
regional road, reconstruction, design, construction