摘要
结合晋阳高速公路工程实例 ,介绍了隧道病害处治的施工工艺 ,并对施工工艺流程的各要点进行了说明 ,阐述了施工中如何进行组织管理 。
Combined with Jinyang Expressway engineering the construction technology is introduced for tunnel defects' treatment. Concrete construction process and construction management are elaborated as well as the assurance measures of engineering quality.
出处
《山西建筑》
2003年第13期122-123,共2页
Shanxi Architecture
关键词
晋阳高速公路
隧道
工程质量
施工组织
病害
defect, assurance measure, construction technology, tunnel maintenance