期刊文献+

项目目标进度的设定对项目表现的影响(英文) 被引量:3

The Influence of Schedule Target on Project Performance
原文传递
导出
摘要 为了获得竞争优势,项目管理者经常编制不现实的项目进度计划.然而不现实的目标进度往往会恶化项目在时间,成本及质量等方面的表现.在此,建立系统动力学模型来研究目标进度对项目表现的影响,为项目管理者理解项目中的回路,延迟及各种非线性关系提供了有用的工具. Many organizations set ambitious schedule target for their product development projects to gain competitive advantages. However, ambitious schedule target might be the main factor to deteriorate project performance. The features of system dynamics application in project management is discussed and it establishes a generic simulation model to study the effects of schedule pressure and provide a helpful tool for project management to understand feedbacks, delays and nonlinear relationships in project and how project behaviors are driven by project structures.
出处 《复旦学报(自然科学版)》 CAS CSCD 北大核心 2003年第5期699-705,共7页 Journal of Fudan University:Natural Science
关键词 项目管理 系统动力学 复杂系统 project management system dynamics complex system
  • 相关文献

参考文献7

  • 1Junsi B. Modem project management[M]. Beijing:Mechanism & Industry Press, 2002.
  • 2BI Xing,ZHAI Li. Project management[M]. Shanghai:Fudan University Press, 2000.
  • 3Burke R. Project management: Planning and control[M]. New York: John Wiley & Sons, Inc. 1993.
  • 4Ford D N. A behavior approach to feedback loop dominance analysis[J]. System Dynamics Review, 1999, 15(1):3-36.
  • 5Forrcster J W. Industrial dynamics[M]. Portland OR, USA:Productivity Press, 1961.
  • 6Rodrigues A, Bowers J. The role of system dynamics in project management[J]. International Journal of project Management, 1996,14(4) : 213-220.
  • 7WANG Qi-fan. System dynamics[M]. Beijing:Tsinghua University Press, 1994.

同被引文献18

引证文献3

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部