摘要
本文研究分析了影响矿井采掘计划预测精度的因素,介绍了样本数据的检验方法和预处理方法,并用实例显示了预测预报的效果。
This paper analyzed the factors which affected the predicting precision of mine mining-devdopment planning, and presents the methods for checking and pretreating the sample data. The practical examples for demonstratgin the results of prediction are given.
出处
《山东矿业学院学报》
CAS
1992年第2期107-119,共13页
Journal of Shandong University of Science and Technology(Natural Science)
基金
煤炭科学基金
关键词
矿井
采掘计划
预测
检验
精度
mining-development planning
predicting
precision
sample data, predicting and forecasting