摘要
分析了扬子石化公司PTA装置在600kt/a改造的设计基础上,进一步提高生产能力的可行性。并从工艺操作、设备维护、技术进步等方面,探讨影响PTA装置高负荷运行的主要因素及提高生产能力的有效途径。
The feasibility of making further improvement on the production capacity of Yangzi Petrochemical Co PTA plant on the design basis of 600 kt/a modification was analyzed.The main factors that have effect on PTA plant high load running and the effective ways to improve the production ability were discussed from the aspect such as process operating,equipment maintenance,technique improvement.
出处
《聚酯工业》
CAS
2003年第5期40-43,共4页
Polyester Industry