摘要
塑性混凝土是近年来发展的一种新型防渗墙体材料,针对岳城水库大副坝严重渗漏的状况,采用了塑性混凝土防渗墙进行除险加固,取得了良好的效果,揭示了塑性混凝土应用于土坝坝基和坝体的优越性。
Plastic concrete is a recently developed newtype material for cutoff wall. According to the status of second dam' serious leakage of YueCheng reservoir, the plastic concrete cutoff wall reinforcement is adopted. It acquired favorable effect. This article introduced the advantages of plastic concrete on earth dam foundation and dam body.
出处
《河北建筑科技学院学报》
2003年第3期38-40,共3页
Journal of Hebei Institute of Architectural Science & Technology
关键词
均质土坝
塑性混凝土
防渗墙
岳城水库
homogeneous earth dam
plastic concrete
cut-off wall
YueCheng reservoir