摘要
龙滩水电站工程规模巨大,技术复杂,为确保工程顺利建设,必须加强重大技术问题的前瞻性研究,提供强有力的技术支持和建立相应的技术管理体系。龙滩水电站工程在建设过程中,着重抓好重点技术问题的超前研究,建立了自己的技术管理体系,为工程建设解决了许多重大的技术问题。
The Longtan hydropower project is large in scale, complex in technology. In order to ensure the smooth construction of the Project, the study on the key technical problems should be strengthened so that it can provide strong technical support and set up a corresponding technology administration system. During the construction of the Project, we focus on the study on key technical problems and we had set up a corresponding technology administration system, which solves many important technical problems of the construction of the project.