摘要
结合G312线徐-界段兰州永登庄浪河大桥钻孔灌注桩基础施工,对钻孔灌注桩基础断桩的成因进行了详细的分析,简明扼要的论述了断桩的处理措施。
In this paper, the author analyses the cause of cast\|in\|place pile foundation breaking, based on the cast\|in\|place pile foundation building in Zhuanglang River Bridge at Yongdeng, G312 road, and discusses the treatment, scheme and theoretic computation method of the breaking pile.
出处
《甘肃科学学报》
2003年第F08期149-153,共5页
Journal of Gansu Sciences
关键词
钻孔灌注桩
断桩
分析
处理
cast-in-place pile
breaking pile
analysis
treatment computation