摘要
甘肃古浪县十八里铺水库是龙沟河上的一座小型水库,1970年始建,1974年竣工,运行近30a以来,由于水库淤积,库容减小较为严重,目前已不能满足当地灌溉和生活用水的需要,因此水库主管部门决定加高主坝1 42m 大坝加高后,库区水位随之提高,坍岸规模将扩大并危及两岸既有公路和铁路的安全 为了避免坍岸对两岸工程带来危害和减缓水库淤积。
Shibalipu reservoir is a small\|scale reservoir built over Longgou River in Gulang country, Gansu province. It was constructed from 1970 and completed in 1974. Owing to the soil deposition, the reservoir capacity decrease sharply during 30 years, already doesn't meet the need of irrigation and living usage at present, so the managers of the reservoir administrative department decided to heighten the dam by 1.42 m. The water level will rise up and the reservoir collapse will extend. If the dam is heightened, the security of the highway and railway beside the reservoir bank will be reduced. To avoid the damage caused by reservoir and reduce the soil deposition, part of the reservoir bank must be protected.
出处
《甘肃科学学报》
2003年第F08期163-166,共4页
Journal of Gansu Sciences
关键词
地质灾害
水库
坍岸
岸坡防护
geological disaster
reservoir
bank collapse
protection of the reservoir bank