摘要
介绍了全站仪在地形起伏较大的特大桥放线控制施工中的应用 ,推导出了任意情况下的一般公式 ,在实际使用中减少了每个桥墩的交点测量工作量 ,在精度和进度上有较大的提高。
The application of total station in surveying construction under special terrain condition with large topographical relief is introduced. The general formula reducing the intersection measurement work of every pier was derived with high accuracy and speed construction for any cases.
出处
《山西建筑》
2003年第14期35-36,共2页
Shanxi Architecture