期刊文献+

组合型复合地基的工程实例 被引量:15

Case History on the Combined Composite Foundation
下载PDF
导出
摘要 通过介绍一个由夯实水泥土桩和CFG桩构成的组合型复合地基的工程实例 ,说明在湿陷性黄土地区 ,采用组合型复合地基既可消除地基土层的湿陷性 ,又能获得较高的承载力 ,具有显著的经济效益。同时指出了根据单桩静载试验结果计算组合型复合地基承载力时应注意的问题。 The case history of the combined composite foundation with compacted cement soil piles and CFG piles is introduced.In the region of collapsible loess,the application of combined composite foundation can not only eliminate the collapsibility of the soil but also improve its bearing capacity.It is prominently economical.Some problems should be paid attention to when the bearing capacity of the combined composite foundation is calculated from the loading test results of single pile.
出处 《工程勘察》 CSCD 北大核心 2003年第5期34-37,共4页 Geotechnical Investigation & Surveying
关键词 复合地基 组合型复合地基 夯实水泥土桩 CFG桩 单桩 静载试验 湿陷性黄土 composite foundation combined composite foundation compacted cement soil pile(CS pile) CFG pile
  • 相关文献

参考文献2

二级参考文献5

共引文献152

同被引文献93

引证文献15

二级引证文献119

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部