整体现浇斜板桥的裂缝成因 被引量:3

Cracks in integral skew slab bridge cast-in-site
下载PDF
导出
摘要 对于整体现浇斜板桥出现底板裂缝等病害,通过结构内力、应力计算进行了分析。结果表明,对于宽的斜板桥不宜采取整体现浇,而宜于在斜板的纵向增加一、两条铰缝,从而使支承反力分布趋于均匀,横向弯矩减小,主应力值减小;不得已要采用整体现浇,则应注意横向抗弯钢筋和抗扭钢筋的配置,且预应力筋束必须满足顶、底缘应力限值及强度的要求。 In dealing with the crack disease appeared on bottom slab for many integral skew slab bridge castinsite,its structure internal force and stress were calculated.The results show that integral castinsite is not a suitable construction method for wide skew slab bridges, the suitable one is to add one or two warping joints along the longitudinal direction of diagonal slab bridge, so as to distribute the internal force more even. If the integral castinsite method have to be used, attention must be paid to the distribution of antibending and antitwisting steel in cross section, and prestressed steel tendon must meet the needs of strength,the stress on top and bottom edge must reach the limit.
出处 《长安大学学报(自然科学版)》 EI CAS CSCD 北大核心 2003年第5期40-42,共3页 Journal of Chang’an University(Natural Science Edition)
关键词 桥梁工程 裂缝 铰缝 结构 内力 应力 整体现浇斜板桥 施工 bridge engineering integral skew slab bridge crack warping joint structure internal force strees
  • 相关文献

参考文献2

  • 1叶见曙.结构设计原理[M].北京:人民交通出版社,1998..
  • 2.JTJ 023—85.公路钢筋混凝土及预应力混凝土桥涵设计规范[S].,1985..

共引文献30

同被引文献22

引证文献3

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部