主要介绍作者研制的《网络计划与资源优化》软件在施工项目成本管理中的应用,施工项目管理者如何有效地对工程项目的成本进行控制和管理,本文作者从理论与实践上加以阐述.施工项目管理者只需少量的有效数据输入,就能获得工程总进度及其分支的工程进度和工程总成本及分支的分析图.对于增强项目管理效益,进行项目成本的事前控制、事中控制和事后分析具有重要的意义.
This paper introduces the software of network schedule and resource optimization developed to apply to cost management of construction project, meanwhile, on the base of theory and practice, the paper puts forward the scheme of how to control and manage the cost of the project effectively for project supervisor. The supervisor only puts in a few valid data, he can obtain the analysis chart of the general cost and the schedule and cost of the offset of the project. The application of the software has significant meaning on precontrolling, eventcontrolling and backanalysising the project cost, at the same time it can enhance manageing benefit.