摘要
由于铁路建设项目环境影响具有渐变性,影响区域无法明确划分.本文建立了铁路环境影响评价的指标体系,应用层次分析法和模糊综合评判法计算铁路建设项目环境影响综合评价值,并给出了评价示例.
Since the environmental impact of railway construction projects has the character of gradual change,the dividing line of the impacted region is indistinct.This paper set up the index system of assessment on environmental impact affected by railway and applies the Analytic Hierarchy Process and Fuzzy Comprehensive Evaluation to the calculation of the comprehensive evaluation value of environmental impact of railway construction projects. As an example,one railway construction project was evaluated.
出处
《华东交通大学学报》
2003年第5期49-51,90,共4页
Journal of East China Jiaotong University
关键词
铁路建设
项目管理
环境影响评价
模糊综合评价
评价指标体系
层次分析法
选线设计
railway construction projects
index system
environmental impact assessment
fuzzy comprehensive evaluation
analytic hierarchy process