摘要 针对矿区地质勘探侧重于开采阶段的工程地质工作,忽视了建井期间的工程地质工作,因而造成部分工作的重复投入,引起人力、物力、财力的浪费和施工周期的延长这一带有普遍性的问题,详细讨论了矿区岩体工程地质稳定性问题,并指出今后在地质勘探中增加工程地质勘探的必要性。 On the geological survey and engineering geological exploration is laid special emphasis in mining coal stage, however, in a very important sector in the process of pit-shaft construction those explorations are neglected, so partial work repetetion, and wastes of manpower, material, and financial resources occur, and the mine-shaft construction may be postponed.The stability of rock-mass in Pingdingshan mining area is discussed in detail. It is also pointed out that it is necessary to add engineering geological exploration in the phase of early exploration or supplementary exploration.
作者 肖有才
出处 《南京工业大学学报(自然科学版)》 CAS 2003年第4期89-92,共4页 Journal of Nanjing Tech University(Natural Science Edition)
关键词 煤矿 地质勘探 平顶山 工程地质勘探 稳定性 geological exploration bound rock pit-shaft stability
  • 相关文献

参考文献1

  • 1谷德振.岩体工程力学基础[M].北京:科学出版社,1979..

同被引文献20

引证文献3

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部