结合保定热电厂450t/hCFB的启动调试,针对大容量CFB锅炉的点火启动技术进行了探讨,对点火启动过程和影响点火的因素进行了分析,提出了相关控制参数。
Based on the startup commissioning of the 450 t/h boiler in Baoding Cogeneration Power Plant, a primary preliminary discussion on the ignition and startup technology of large capacity CFB boiler is presented, including the factors affecting ignition and startup process and their related control parameters.