摘要
针对动力厂35t/h锅炉的工艺控制要求,选用SUPMAX500集散控制系统。介绍了系统的软、硬件构成及其具体实施方法。
In accordance with the requirements of technics control in 35 t/h boiler of powerworks,the SUPMAX500 distributed control system is chosen.The hardware,software composition and concrete implementing strategy of the platform are presented.
出处
《江西冶金》
2003年第5期25-27,共3页
Jiangxi Metallurgy