摘要
对上三线十三标段的桥梁高墩施工方案进行了选择和比较 ,发现滑模施工技术无论在技术上还是经济上都优于其它施工方案 ;同时对滑动模板的设计和施工中的关键技术进行了简明扼要的阐述。
With a comparison analysis of the pier construction approaches practised on the thirteenth segment of Shangsan Road,this paper points out the slip_form construction technology is better than other approaches not only in technology but also in economy.It also introduces keypionts in the design and construction of slip_form.
出处
《浙江交通职业技术学院学报》
CAS
2002年第4期24-26,共3页
Journal of Zhejiang Institute of Communications