摘要 对大型斜拉桥施工控制网的网形优化、精度设计、选点原则、施测方法等进行分析 ,提出使用的施工控制网网形和施测方案 ,以保证全桥及主桥与线路连接的整体性 ,同时满足定位测量、施工放样的需要。 The authors analyze the improvement in the form of controlled network,precision design,the principle of select point which control the elevation,the measurement of construction surveying that specially uesd in the cable-stayed bridge. On the basis of this ,the authors introduce the form of construction controlled network and schema of construction to the integration which the whole bridge and main bridge connected with the highway ,to fulfill the request of surveying and putting design into practise through the whole construction.
出处 《东北测绘》 2002年第3期77-78,共2页 Northeast Surveying and Mapping
关键词 桥梁施工 施工控制网 平面控制网 斜拉桥 施工测量 优化 设计 选点 cable-stayed bridge construction controlled network surveying
  • 相关文献

参考文献2

  • 1[1]杨文渊,钱绍武.桥梁施工工程师手册[Z].北京:人民交通出版社,1997.
  • 2[2]刘培文.现代公路勘测设计实用技术[M].北京:人民交通出版社,1995.

共引文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部