楼房拆除中控制爆破措施的综合运用 被引量:1

COMPREHENSIVE APPLICATION OF CONTROLLED BLASTING IN BUILDING DEMOLITION
下载PDF
导出
摘要 1# 和 2 # 两幢框架结构楼房成一直线排列 ,相距 7m。因环境条件所限 ,只能纵向向西顺序倾倒。 2 # 楼西端的楼梯间与主楼之间有施工缝相隔 ,成为具有较大高宽比的独立结构。根据被拆除物的不同结构特点 ,采用不同的控制爆破措施。 1# 楼的箱形基础与地上结构同时爆破拆除。通过选择合理的爆破切口高度和适宜的延迟时间 ,1# 楼和 2 # 楼主体朝预定的方向顺序倾倒 ,而楼梯间倾倒在 1# 楼的爆堆上。 Two frame buildings,No.1 and 2,are arranged in a line and separated by 7 meters.Because of limited environmental conditions,sequential collapsing to the west is merely permitted.The staircase located in the western end of the building No.2 is separated from main structure by a construction joint,becoming a separated structure with a large proportion of height to width.In the light of different features of the constructions to be demolished,the different measures of controlled blasting are adopted.The box-shape basement and surficial structure of the building No.1 are simultaneously demolished by blasting method.Through selecting reasonable cut height and suitable delayed interval,the building No.1 and the main structure of the building No.2 collapse sequentially to predetermined direction and the staircase collapses on the broken pile of the building No.1.
出处 《工程爆破》 2002年第2期39-41,共3页 Engineering Blasting
关键词 框架结构楼房 控制爆破 拆除爆破 上海 Frame structure Blasting demolition Controlled blasting
  • 相关文献

参考文献2

  • 1林学圣 阎家良.控制爆破[M].北京:解放军战士出版社,1982..
  • 2杨人光 史家育.建筑物爆破拆除[M].北京:中国建筑工业出版社,1985..

共引文献57

同被引文献3

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部