摘要 采用微差控制爆破与分步开挖相结合的施工方法。第一步 ,用垂直孔和楔形掏槽开挖沉井中央的基岩 ,用三个凿岩爆破循环开挖到设计标高 ,形成一个直径 4 1m、深 3 4m井。第二步 ,用水平孔开挖厚 0 6 5m井壁 ,每循环下挖 0 5m ,即沉井每次下沉 0 5m ,直至下沉到位。文中主要介绍了炮孔布置、爆破参数选取和起爆顺序设计。 A construction method of combining short-delay controlled blasting with stepped excavation was adopted.Firstly,the vertical blastholes and wedge-shaped cut were used for excavation of base rock in the centre of the well foundation,and a well with a diameter of 4.1 meters and depth of 3.4 meters was formed with three rounds.Secondly,the horizontal holes were used to excavate the well wall with a thickness of 0.65 meters,with a excavating depth of 0.5 meters per round.In other words,the well foundation fell down by 0.5 meters per round until reaching the predetermined position.The blasthole pattern,blasting parameter selection and firing sequence design were mainly presented in this paper.
作者 刘高飞
出处 《工程爆破》 2002年第2期42-44,共3页 Engineering Blasting
关键词 微差控制爆破 分步开挖 凿岩爆破 爆破参数 桥梁 沉井 Base-rock excavation Well foundation Short-delay controlled blasting Stepped excavation
  • 相关文献

参考文献2

二级参考文献3

共引文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部