期刊文献+

熄焦塔的控制爆破拆除

DEMOLITION OF A COKE-QUENCHING TOWER BY CONTROLLED BLASTING
下载PDF
导出
摘要 一座 36m高的钢筋混凝土框架结构熄焦塔下有需要保护的铁路线。采用使塔体定向倾倒后再进行解体的方案爆破拆除 ,保证了爆破后 8h内铁路正常运营。文中介绍了爆破方案的选择、爆破切口高度的确定、爆破振动速度验算。对塔体倾倒过程中立柱上的受力状态进行了分析研究。此外 ,简述了作者对此爆破工程的体会。 There is a railway necessary to be protected under a coke-quenching tower with 36-meter height and reinforced concrete frame structure.The blasting demolition scheme of which the tower body was directionally collapsed and then disintegrated was adopted,ensuring normal running of the railway in 8 hours after blasting.The selection of blasting scheme,determination of blasting cut height and check of blasting vibration velocities were presented.The acting forces on the posts during the collapsing of the tower body were studied.In addition,author's experiences about the blasting project were expounded.
出处 《工程爆破》 2002年第2期23-26,共4页 Engineering Blasting
关键词 熄焦塔 控制爆破 拆除爆破 钢筋混凝土 济南 Coke-quenching tower Frame structure Blasting demolition Stress analysis Controlled blasting
  • 相关文献

参考文献2

  • 1颜事龙,等.爆炸技术及应用[M].江苏:淮南工业学院,1998.
  • 2宋常燕,高金石,陈焕波.120米钢筋混凝土烟囱定向倒塌触地效应的观测分析[A].工程爆破文集第六辑[C].深圳:海天出版社,1997.

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部