摘要
以公路下穿铁路现场整体预制箱形框构桥为例 ,对顶进法施工的特点、工艺原理、施工工艺等作了详细阐述 ,提出了顶进系统施工的质量控制及安全措施。
Taking one on site prefabrication work of box frame railway bridge over pass highway as example the characteristics, principle and construction technology of jacking method are elaborated as well as related quality control and safety measures.
出处
《山西建筑》
2003年第16期38-39,共2页
Shanxi Architecture
关键词
预制钢筋混凝土
桥梁施工
顶进法
箱体
prefabricated reinforced concrete, bridge construction, jacking method, box