摘要
在独山子炼油厂重整装置改造中,针对特殊施工要求(施工周期仅一个多月),加热炉设计采用了深度预制、整体组装的设计方案,从而在技术水平和施工进度上满足了工程要求。
In the reformation of Du Shan Zi refinery reformer unit, in connection with the special construction requirement (construction period only more than one month) , the furnace design adopted through prefabrica-tion, whole assembly plan, then the engineering requirements of technology quality and the construction tempo were satisfied.