摘要
鞍钢新三烧有两台265m^2烧结机,于1989年建成投产,具有完整的冷却、整粒、铺底料等工艺和先进的自动化控制系统,经过8个月的调试和生产实践表明,已基本达到设计水平。
The new sintering plant No.3 in Anshan I&S, Co. was put in operation in 1989. There are two sintering machines(265m^2 each)in the plant. The basic flowsheet involves hearth layer, cooling, size-stabilization and advanced automatic control systems. After 8 months of start up adjustingand production operating, the designed targets have been reached.
出处
《烧结球团》
北大核心
1992年第2期19-22,共4页
Sintering and Pelletizing