摘要
提出了一种基于MATLAB新的弹性水击计算方法,提高了计算精度,而且易于建模仿真.仿真实验结果表明,新的计算方法更加准确地反映了水击压力极值点及整个动态过程,这对保证水电站运行的安全性和经济性以及研究机组动态过程有理论和实际应用价值.
Animproved methodis proposed based on MATLAB ,which can lessen the calculation error to a great extent.The simulation studies based on simul inkin MATLABhave shownthat this newmethod will benefit the economy of hydropower plantand help the study of the dynamic process of the unit.
出处
《华北水利水电学院学报》
2003年第4期44-47,共4页
North China Institute of Water Conservancy and Hydroelectric Power