摘要
在船台工程上大面积使用人工挖孔桩作为结构的基础在国内尚属首次。本文简要介绍了由于地质情况等因素的影响,船台基础桩基型式的演变过程、人工挖孔桩的施工方法和质量检测及安全管理等。
It is the first time that large-area manually excavated piles were applied as the foundation of structure in ship-building berth project. This paper introduces in brief the evolution process of pile foundation types for ship-building berth foundation due to the influences of some factors such as geologic conditions, the construction method of manually excavated piles, as well as the quality inspection and safety management.
出处
《水运工程》
北大核心
2003年第10期49-51,共3页
Port & Waterway Engineering
关键词
人工挖孔桩
灌注混凝土
施工
质量检测
安全
manually excavated pile
cast-in-situ concrete
construction
quality inspection
safety