摘要
本文在调查研究的基础上,指出当前铁路隧道施工通风困难的各种原因,提出了长距离软管通风的新方法;总结了“引大入秦”工程实践中应用研究所取得的初步成果。
Based on field investigations, the causes of ventilation difficulties during the con-
struction of single--track railway tunnels are revealed. A new methed of long distance ventilation with
soft pipes is suggested, and some positive results of its application in construction practice are summa-
rized.
出处
《石家庄铁道学院学报》
1992年第4期66-70,共5页
Journal of Shijiazhuang Railway Institute