船舶大型化的发展趋势使得海港防波堤口门计算的方法面临新的问题 。
The tendency to build very large vessels makes the methods of calculating the entrance breadth formed by breakwaters in sea ports face new problems.The paper expounds on the issue by taking into consideration the actual coastal wave conditions and the development of ship building in China.Preliminary recommendations to modify the calculation methods are presented on the basis of foreign literatures and references.
出处
《中国港湾建设》
北大核心
2003年第5期15-16,共2页
China Harbour Engineering
关键词
防波堤
海港总平面设计
波浪影响
breakwater
general layout design of sea port