摘要
建设项目施工过程中,工程索赔几乎是不可避免的。业主在招标过程中就应考虑可能存在的工程索赔的风险,并采取积极的措施予以避免。本文将招标工作分为:招标前期准备、招标图设计、招标文件的编制、标底编制和评标等5个阶段,针对每阶段的工作内容提出相应的防索赔措施。
Engineering claim is almost unavoidable during construction, so proprietors shall consider all possible risks of engineering claims and take active measures to avoid them. In this paper, the bidding work is divided into 5 stages including front-stage preparation before bidding, bid drawing design, bid document compilation, bottom price compilation and bid evaluation, corresponding claim-avoiding measures in the light of the work contents of each stage are put forward.
出处
《水运工程》
北大核心
2003年第9期8-10,共3页
Port & Waterway Engineering