期刊文献+

三峡梯级水电站日优化运行研究(英文) 被引量:1

Studies on Optimal Daily Scheduling of the Three Gorges Cascaded Hydroelectric Stations
下载PDF
导出
摘要 针对三峡梯级水电站日优化分配问题 ,在满足给定梯级负荷和提供足够备用容量的情况下 ,使得梯级耗能最小。本文应用拉格朗日松弛法求解梯级日优化问题 ,应用拉格朗日乘子松弛系统耦合约束 ,考虑电站变水头和站间水流时滞的影响 ,进行梯级电站的负荷优化分配 ,并将分配计划应用于实时运行当中。实例研究表明 ,该方法有效、实用 ,能够实现在线优化和实时运行。 For the daily scheduling problem of the Three Gorges (TG) cascaded hydroelectric plants,the selected objective function requires minimization of the value of energy used by turbines and spillways of the TG cascaded plants during the studied period,while meeting a predefined power demand and providing sufficient reserve capabilities.A Lagrangian Relaxation (LR) algorithm has been successfully implemented in the daily optimal scheduling,and the schedule is further refined in the real-time frame using a dynamic programming (DP) solution to assure the security,reliability,real-time and economy of the system operation.The coupling constraints,power demand and the spinning reserve etc.,are taken into account by Lagrangian multipliers.The factors such as variable head and time delays are also considered in the solution.The case study based on the data of the TG cascade simulation operation shows that the schema is efficient and practical.It can be applied for the online scheduling and real-time operation.
出处 《湖南文理学院学报(自然科学版)》 CAS 2003年第3期67-74,共8页 Journal of Hunan University of Arts and Science(Science and Technology)
关键词 三峡 梯级水电站 拉格朗日松驰 日优化分配 实时运行 Cascaded Hydroelectric System Lagrangian Relaxation Daily Optimal Scheduling Three Gorges Hydroelectric Plant Real-time Operation
  • 相关文献

参考文献17

  • 1[1]Willuam W and G. Yeh. Reservoir management and operations Models:A State- of- the- Art Review[J]. Water resource Research. 1985,21(12):1797- 1818.
  • 2[2]D.L. Beng and B. H. Amir. Optimal Operational Planning for a Hydroelectric Generation System [J]. IEE Proceedings. 1988, 135(3): 169 - 181.
  • 3[3]J.M. Pursimo, H. K. Antila, M. K. Vilkko and P. A. Laurala. A Short - term Scheduling for a Hydropower plant chain[J]. Electric Power & Energy Systems, 1998,20(8): 525- 532.
  • 4[4]Jin - Shyr Yang, Nan - ming Chen. Short term Hydrothermal Coordination Using Multi - Pass Programming [ J ].IEEE transactions on power systems, 1989, 4(3): 1050 -1056.
  • 5[5]Shi - Chung Chang, Chun - Hung Chen, I - Kong Fong and P. B. Luh. Hydroelectric Generation Scheduling with an Effective Differential Dynamic Programming Algorithm [ J ].IEEE transactions on power systems. 1990, 5 ( 3 ): 737 -741.
  • 6[6]H.Z. Yan, P. B. Luh, X. H. Guan. Schedule of Hydrothermal Power System [ J ]. IEEE transactions on power systems. 1993,8(3): 1358 - 1365.
  • 7[7]J. Naccarino, R. Cheung, W. Briggs, N. Mayur. Real - Time Monitoring, Optimization and Control of a Hydroelectric Complex[ J]. IEEE Transactions. on Power Systems. 1988,3(4): 1769 - 1783.
  • 8[8]A.Arce,T, Ohishi,and S.Soares. Optimal Dispatch of Generating Units of the Itaipu Hydroelectric Plant [ J ]. IEEE transactions on power systems. 2002, 17( 1 ): 154 - 158.
  • 9[9]M.R. Piekutowski, T. Litwinowicz, R. J. Frowd. Optimal Short- term Scheduling for a Large- Scale Cascaded Hydro System [ J ]. IEEE Transactions. on Power Systems.1994,9(2) :805 - 811.
  • 10[10]M.S. Salam, K. M. Nor, A. R. Hamdam. Hydrothermal Scheduling Based Lagrangian Relaxation Approach to Hydrothermal Coordination[J]. IEEE transactions on power systems. 1998,13(3): 226 - 234.

同被引文献10