期刊文献+

实施污水总量控制与达标排放重在污染治理

Pollution Disposal is Most Important to Implement Total Control and Meet Requirements of Discharging Standard on Wastewater
下载PDF
导出
摘要 为实现2000年污染源达标排放和污染物总量控制目标,大庆油田制定了“工业污染源达标计划”、“污染物排放总量控制计划”;提出了2000年超标企业排污总量削减方案;对化工助剂总厂和腈纶工程的化工污水。 In order to implement the goal of 2000 on total control and meet the requirement of discharging standard,Daqing Oilfield formulates the plan for industrial pollution sources to meet the standard and the plan for total control on discharging pollutants.A scheme on reducing the total amount of pollutants discharged by corporations is suggested.Concrete measures are also suggested to treat chemical wastewater from chemical agent center factory and acrylic fibres engineering,as well as cyanide wastewater increased recently in the tertiary oil recovery engineering.
出处 《油气田环境保护》 CAS 1999年第2期1-3,共3页 Environmental Protection of Oil & Gas Fields
关键词 污水处理 污染控制 排污量 大庆油田 environmental management,sewage,sewage disposal
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部