期刊文献+

务坪水库不稳定山体及滑坡体的处理研究 被引量:2

Study on the slope stabilization of Wuping Reservoir
下载PDF
导出
摘要 务坪水库坝轴线上游右岸不稳定山体及左岸3号滑坡体的处理是其建坝的技术难点之一。在进行岸坡处理方案的研究论证中,充分考虑了工程的实际情况,将岸坡加固处理措施与坝体结构布置有机地结合起来,提出了经济合理、可靠的处理方案,取得了很好的效果。 The stabilization of right abutment slope and No.3 left abutment slope of the Wuping Reservoir is one of the key technical difficulties during its dam construction. In present stabilization scheme, the actual conditions of the project were fully considered and the stabilization measures of slope were combined with the layout of dam body structure. An economical, reasonable and reliable treatment scheme is proposed and adopted and a good effectiveness has been gained.
出处 《水力发电》 北大核心 2003年第11期14-16,共3页 Water Power
关键词 振冲加固 反压平台 岸坡 临空面 务坪水库 vibroflotation reinforcement, back-pressure platform, abutment slope, air face, Wuping Reservoir
  • 相关文献

参考文献2

二级参考文献2

  • 1张天明 丁留谦 柴方昆.振冲在水库深厚成层湖积层软基处理中的应用[A].丁留谦,柴方昆.水利水电工程学理论与应用[C].北京:中国科学技术出版社,1995.215-219.
  • 2刘家豪.塑料排水法加固软基技术的现状和展望[M].南京:河海大学出版社,1990..

共引文献3

同被引文献4

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部