摘要
本文介绍粘土防渗帷幕在天津港南疆非矿泊位码头后方地基处理工程中的应用情况,铺膜抽气后膜下真空度很快达到设计要求。
This paper introduces the application of see proofcurtain in the works of foundation treatment in the rearward of Nanjiang Non ore berth in Tianjin Port. The vacuum degree under membrane rapidly reached the design requirement after air pumping. Practice shows that the application of a clay seep proofcurtain mixing technique is successful.
出处
《中国港湾建设》
1999年第4期37-39,共3页
China Harbour Engineering