摘要
以哈尔滨市宣化桥工程为实例,阐述了钻孔灌注桩的施工过程以及对常见事故的预防与检查处理方法。
Based on the engineering practice through the example of Harbin Xuanhua Bridge, discussion is made on the construction process of Drilling-perfusion-pile method and the related measures.
出处
《交通科技与经济》
1999年第4期33-34,37,共3页
Technology & Economy in Areas of Communications